2012 UNCITRAL Digest of case law on the United Nations Convention on the International Sale of Goods

Digest of Article 64 case law [reproduced with permission of UNCITRAL] [*]

[Text of article
Overview
Avoidance for Fundamental Breach (Article 64(1)(a)
Avoidance for Failure to Pay or to Take Delivery within an Additional Period of Time Fixed (Article 64(1)(b))
Declaration of Avoidance of the Contract
Period of the time for Declaration of Avoidance when the Price has been paid (Article 64(2))]

Article 64

(1) The seller may declare the contract avoided:
(a) If the failure by the buyer to perform any of his obligations under the contract or this Convention amounts to a fundamental breach of contract; or
(b) If the buyer does not, within the additional period of time fixed by the seller in accordance with paragraph (1) of article 63, perform his obligation to pay the price or take delivery of the goods, or if he declares that he will not do so within the period so fixed.

(2) However, in cases where the buyer has paid the price, the seller loses the right to declare the contract avoided unless he does so:
(a) In respect of late performance by the buyer, before the seller has become aware that performance has been rendered; or
(b) In respect of any breach other than late performance by the buyer, within a reasonable time:
(i) After the seller knew or ought to have known of the breach; or
(ii) After the expiration of any additional period of time fixed by the seller in accordance with paragraph (1) of article 63, or after the buyer has declared that he will not perform his obligations within such an additional period.

OVERVIEW

1. Article 64 defines the conditions under which the seller is entitled to declare the contract avoided. The rules mirror those of article 49 governing the buyer's right to declare the contract avoided for breach by the seller.[1] The effects of avoidance are governed by articles 81 to 84. The seller must declare the contract avoided by means of a notice (article 26). Avoidance under article 64 is available in two cases: first, if the buyer's failure to perform its contractual obligations amounts to a fundamental breach of contract as defined in article 25 (article 64(1)(a)); and, secondly, if the buyer fails to pay the price or to take delivery of the goods within an additional period of time fixed pursuant to article 63 (article 64(1)(b)).

2. Avoidance of the contract is a remedy of last resort (ultima ratio) that is available when the seller cannot be expected to continue the contract.[2] Avoidance does not occur automatically but requires notice of avoidance by the seller (article 26). In cases of non-payment of the price, the seller is entitled to avoid the contract at any time after all prerequisites for avoidance have been met. Where the buyer has paid the price, the seller loses the right to avoid the contract if the seller does not exercise it within the time periods specified in article 64(2).

Avoidance for Fundamental Breach (Article 64(1)(a))

3. The first situation in which the seller can avoid the contract under article 64(1) is where the buyer has committed a fundamental breach of contract as defined in article 25.[3] This requires that the breach of contract cause the seller such detriment as to substantially deprive the seller of what it was entitled to expect under the contract unless the breaching buyer did not foresee and a reasonable person of the same kind in the same circumstances would not have foreseen such a result (article 25). One arbitral award noted in this connection that, "according to both the general framework of the Convention and its interpretation in case law, the notion of fundamental breach is usually construed narrowly in order to prevent an excessive use of the avoidance of the contract."[4] Case law affords many illustrations of fundamental breaches involving three conceivable types of contract violations, namely failure to pay the price, failure to take delivery of the goods, and nonperformance of other obligations imposed by the contract on the buyer.

4. Definitive failure to pay the price or a large part of the price generally constitutes a fundamental breach of contract.[5] Proof of definitive failure to pay the price will often derive from a declaration by the buyer that it will not settle the price[6] or from the buyer's insolvency situation.[7] Conversely, a mere delay in payment of the price is not construed as a fundamental breach[8] unless timely performance of the obligation to pay the price is of the essence of the contract. Failure to open a letter of credit at the time fixed by the contract does not automatically constitute a fundamental breach.[9] However, it may amount to a fundamental breach according to the circumstances of the case.[10] It was possible to rule, in a case involving the conclusion of several successive contracts, that non-payment of the price of some of the contracts did not constitute a fundamental breach of the other contracts unless the seller and the buyer had concluded a framework agreement.[11] Where the buyer has not paid but the requirements for a fundamental breach do not appear to be met, the seller can benefit from fixing an additional period of time for the buyer to pay, which allows the seller to avoid the contract pursuant to article 64(1)(b) if the buyer fails to pay the price within that period.[12]

5. A buyer's final failure to take delivery of the goods normally constitutes a fundamental breach of contract.[13] In general, a delay of a few days in the delivery of the goods is not construed as a fundamental breach.[14] However, such a delay can amount to a fundamental breach where observance of the date for taking delivery is especially important for the seller owing to the structure of the contract, for example if the sale relates to perishable goods or if the seller has to have rapid access to its storage or transport facilities.[15] It has been held, in connection with an instalment contract requiring the buyer to take delivery of a specific quantity of goods each year, that the fundamental nature of the breach committed by the buyer in taking insufficient goods one year must be assessed in relation to the quantities under the entire contract, not just those to be supplied annually.[16]

6. Non-performance of obligations other than payment of the price or taking delivery of the goods can also amount to a fundamental breach where the criteria set forth in article 25 are met. The existence of a fundamental breach was acknowledged by one court with regard to a re-export prohibition imposed on the buyer.[17] Conversely, one court held, in connection with the buyer's duty to cooperate with the seller in drawing up a delivery schedule for the following year, that the insufficient cooperation of which the seller accused the buyer did not constitute a fundamental breach in light of the criteria in article 25.[18]

Avoidance for Failure to Pay or to Take Delivery within an Additional Period of Time Fixed (Article 64(1)(b))

7. Article 64(1)(b) provides for a second ground of contract avoidance, applicable only in cases of non-payment of the price or failure to take delivery of the goods:[19] the seller can avoid the contract if the buyer has not paid the price or taken delivery of the goods within the additional period of time fixed by the seller under article 63(1).[20] The seller may also avoid the contract if the buyer declares that it will not pay the price or take delivery of the goods within the period so fixed. Entitlement to avoidance pursuant to article 64(1)(b) overcomes the difficulties surrounding the question whether the breach committed by the buyer is fundamental on the basis of the criteria set forth in article 25. It can exceptionally happen that decisions hold that the seller is entitled to avoid the contract only if the seller has previously fixed an additional period of time for performance by the buyer, thus disregarding the scope of article 64(1)(a). [21]

8. The mechanism for avoiding the contract as established in article 64(1)(b) is inapplicable in cases where the buyer breaches an obligation other than payment of the price or taking delivery of the goods. It is thus important to determine whether the buyer's breach can be construed as a violation of the obligation to pay the price or to take delivery of the goods. Under article 54, the steps or formalities required to enable payment to be made are part of the obligation to pay the price. Thus, failure to open a letter of credit comes within the sphere of application of article 64(1)(b). [22] The same reasoning applies if the buyer does not perform the acts which could reasonably be expected of the buyer to enable the seller to effect delivery of the goods.

9. Where the seller fixes an additional period of time for the buyer to perform obligations other than the obligation to pay the price or to take delivery of the goods, the buyer's failure to perform the obligation concerned by the end of that period does not permit the seller to avoid under article 64(1)(b). The contract may be avoided only if the breach is fundamental (article 64(1)(a)). However, such a time limit is not totally ineffective. On the one hand, the seller may not, during that period, resort to any remedy for breach of contract (article 63(2)). On the other, refusal to perform an obligation other than payment of the price or taking delivery of the goods could add to the weight of the non-performance and can influence the assessment of the fundamental nature of the breach committed by the buyer.[23]

Declaration of Avoidance of the Contract

10. Under article 64, avoidance of the contract is effected by means of a declaration by the seller ("The seller may declare the contract avoided").[24] By virtue of article 26, a declaration of avoidance of the contract is effective only if made by notice to the buyer.[25] In accordance with article 27, a delay or error in the transmission of the communication or its failure to arrive does not deprive the seller of the right to rely on the communication. Pursuant to article 11, the notice need not be in writing and is not subject to any requirement as to form, except where the article 96 reservation applies. The freedom-from-formrequirements principle governing the notice means that the avoidance declaration can be made orally or derive from the seller's action.[26] Irrespective of the means of expression chosen by the seller, the notice must clearly indicate that the seller is terminating the contract.[27] According to several court decisions, the avoidance declaration may already be contained in the notice by which the seller fixes an additional period of time for performance by the buyer.[28] This is the case where a seller, when fixing an additional period, declares that the contract will be avoided forthwith in the event of non-payment of the price within the period fixed.[29] On the other hand, a mere threat to avoid the contract is not sufficient.[30] Avoidance can also result from the filing of a lawsuit or arbitration proceedings with a view to contract avoidance,[31] or from an award of damages for the loss caused by non-performance.[32]

Period of the Time for Declaration of Avoidance when the Price has been Paid (Article 64(2))

11. Article 64(2) specifies the situations in which the seller's right to declare the contract avoided must be exercised within certain periods. Since the rules in article 64(2) are applicable only in cases where the buyer has paid the price, the seller's right to declare avoidance is, in contrast, not subject to time limitations as long as the buyer has not paid the total price.[33] If the buyer has paid only part of the price, the seller continues to be entitled to declare avoidance at any time.[34] In cases of nonpayment of the price, only a waiver by the seller or conduct contrary to the principle of good faith can prevent the seller from declaring the contract avoided.[35]

12. Where the buyer has paid the price, the seller loses the right to avoid the contract if it does not declare avoidance within the periods stated in article 64(2). This provision makes a distinction between late performance and breaches other than late performance. In cases of late performance, the seller loses the right to declare the contract avoided unless it does so before becoming aware that performance has been (tardily) rendered.[36] The provision is accordingly more rigorous than article 49(2), under which, in cases of late delivery by the seller, the buyer is allowed a reasonable time, after becoming aware that delivery has been made, to declare the contract avoided.[37] In regard to any breach other than late performance, article 64(2)(b) makes a distinction according to whether or not the seller has fixed an additional period for performance in accordance with article 63(1). In the absence of an additional period for performance, the seller loses the right to declare the contract avoided unless it declares avoidance within a reasonable time after the seller knew or ought to have known of the breach (article 64(2)(b)(i)). Where the seller has fixed an additional period of time for performance by the buyer, the seller loses the right to declare the contract avoided unless it declares avoidance within a reasonable time after the expiration of the additional period fixed by the seller or after the buyer has declared that it will not perform its obligations within such additional period (article 64(2)(b)(ii)). Article 64(2) has given rise to very little case law.


NOTES

* This presentation of the UNCITRAL Digest is a slightly modified version of the original UNCITRAL text at <http://www.uncitral.org/pdf/english/clout/CISG-digest-2012-e.pdf>. The following modifications were made by the Institute of International Commercial Law of the Pace University School of Law:

   -    To enhance access to contents by computer search engines, we present in html rather than pdf;
 
   -    To facilitate direct focus on aspects of the Digests of most immediate interest, we inserted linked tables of contents at the outset of most presentations;
 
   -    To support UNCITRAL's recommendation to read more on the cases reported in the Digests, we provide mouse-click access to (i) CLOUT abstracts published by UNCITRAL (and to UNILEX case abstracts and other case abstracts); and also (ii) to full-text English translations of cases with links to original texts of cases, where available, in [bracketed citations] that we have added to UNCITRAL's footnotes; and
 
   -    To enable researchers to themselves keep the case citations provided in the Digests constantly current, we have created a series of tandem documents, UNCITRAL Digest Cases + Added Cases. The new cases and other cases that are cited in these updates are coded in accordance with UNCITRAL's Thesaurus.

1. Owing to the similarity of the two provisions, courts sometimes refer to article 64 instead of article 49: see [BELGIUM Rechtbank van Koophandel Kortrijk 4 June 2004]; [GERMANY Oberlandesgericht Nürnberg 20 September 1995] (see CLOUT case No. 229 [GERMANY Bundesgerichtshof 4 December 1996] in which the error in the judgment of the Oberlandesgericht Nürnberg was pointed out).

2. See [GERMANY Oberlandesgericht Brandenburg 18 November 2008]; for a comparable observation in connection with article 49, see the Digest for article 49.

3. See the Digest for article 25.

4. [ICC Court of Arbitration of the International Chamber of Commerce, August 1998 (Arbitral award No. 9887)].

5. [UNITED STATES United States District Court, Southern District of New York 29 May 2009 (Doolim Corp. v. R Doll, LLC et al.)] (in connection with payment of less than 25 percent of the price); [SWITZERLAND Tribunal cantonal du Valais 2 December 2002]; CLOUT case No. 578 [UNITED STATES U.S. District Court, Western District of Michigan, 17 December 2001] (non-payment of the price is the most significant form of a fundamental breach by a buyer); CLOUT case No. 468 [RUSSIA Tribunal of International Commercial Arbitration at the Russian Federation Chamber of Commerce and Industry 5 October 1998]; CLOUT case No. 130 [GERMANY Oberlandesgericht Düsseldorf 14 January 1994].

6. See, for example, [SWITZERLAND Tribunal cantonal du Valais 2 December 2002]; CLOUT case No. 361 [GERMANY Oberlandesgericht Braunschweig 28 October 1999].

7. CLOUT case No. 308 [AUSTRALIA Federal Court of Australia 28 April 1995 (Roder Zelt und Hallenkonstruktionen GmbH v. Rosedown Park Pty Ltd. et al.)].

8. [GERMANY Oberlandesgericht Düsseldorf 22 July 2004]; CLOUT case No. 301 [ICC Court of Arbitration of the International Chamber of Commerce, 1992 (Arbitral award No. 7585)].

9. [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, April 2006 (Arbitral award No. CISG/2006/21)]; [GERMANY Landgericht Kassel 21 September 1995]; [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, 23 April 1995].

10. [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, 15 September 2005]; CLOUT case No. 976 [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, 26 June 2003 (Alumina case)]; [AUSTRALIA Supreme Court of Queensland, Court of Appeal 12 October 2001 (Downs Investments v. Perwaja Steel)]; CLOUT case No. 631 [AUSTRALIA Supreme Court of Queensland 17 November 2000 (Down Investments Pty Ltd. v. Perjawa Steel SDN BHD)]; [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, 1 March 1999]; CLOUT case No. 717 [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, 6 January 1999]; [ICC Arbitration Court of the International Chamber of Commerce, 1999 (Arbitral award No. 10274) (Poultry feed case)]; [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, 21 July 1997].

11. CLOUT case No. 826 [GERMANY Oberlandesgericht München 19 October 2006].

12. See, for example, [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, 15 September 2005]; CLOUT case No. 243 [FRANCE Cour d'appel de Grenoble 4 February 1999] (the court observed that, in the absence of a fundamental breach, the seller should have granted the buyer an additional period of time in which to take delivery); CLOUT case No. 261 [SWITZERLAND Bezirksgericht der Saane 20 February 1997] (failure to obtain a letter of credit within the additional period of time fixed by the seller under article 63).

13. See CLOUT case No. 987 [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, 22 March 2001] (refusal to hire a ship to transport the goods under an FOB sale); CLOUT case No. 217 [SWITZERLAND Handelsgericht des Kantons Aargau 26 September 1997] (refusal to take delivery of the goods) (see full text of the decision); CLOUT case No. 227 [GERMANY Oberlandesgericht Hamm 22 September 1992] (refusal to take delivery of more than half of the goods); [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, 9 January 1993] (refusal to send a ship to transport the goods under an FOB sale).

14. CLOUT case No. 243 [FRANCE Cour d'appel de Grenoble 4 February 1999] (sale of orange juice whose delivery was to be staggered over several months, where the buyer announced a delay of a few days in taking delivery of one instalment); see, however, CLOUT case No. 629 [SWITZERLAND Kantonsgericht Zug 12 December 2002] (the court held that the few days' delay constituted a fundamental breach; the significance of this assertion should be qualified, since the seller had previously granted the buyer an additional period of time without result).

15. See, for a similar assertion, [GERMANY Oberlandesgericht Düsseldorf 22 July 2004] (after stating this principle, the court rejected the existence of a fundamental breach in connection with the late delivery of children's fashion shoes).

16. [GERMANY Oberlandesgericht Brandenburg 18 November 2008].

17. CLOUT case No. 154 [FRANCE Cour d'appel Grenoble 22 February 1995] (a buyer of jeans was required, under the contract, to provide evidence of the final destination of the goods in Africa and South America in order to ensure that a re-export prohibition relating, in particular, to Europe was complied with by the buyer; the court held that the buyer's failure to furnish proof of the final destination of the goods was a fundamental breach).

18. [GERMANY Oberlandesgericht Brandenburg 18 November 2008].

19. [ICC Arbitration Court of the International Chamber of Commerce, September 1996 (Arbitral award No. 8574)] (the ruling referred to the option available to the seller of avoidance for fundamental breach or avoidance upon the lapse of an additional period of time without receiving performance).

20. See, by way of illustration, [GERMANY Oberlandesgericht Karlsruhe 14 February 2008] (payment of the price); CLOUT case No. 886 [SWITZERLAND Handelsgericht St. Gallen 3 December 2002]; [AUSTRIA Oberlandesgericht Graz 24 January 2002].

21. CLOUT case No. 307 [AUSTRIA Oberster Gerichtshof 11 September 1997]. See also the Digest for article 63, paragraph 3.

22. See, by way of illustration, CLOUT case No. 261 [SWITZERLAND Bezirksgericht der Saane 20 February 1997] (failure to obtain a letter of credit within the additional period of time fixed by the seller under article 63).

23. See, for example, CLOUT case No. 154 [FRANCE Cour d'appel Grenoble 22 February 1995] (in connection with the buyer's failure to furnish proof required by the contract of the final destination of the goods, the court stated, in its assessment of the fundamental nature of the breach committed by the buyer, that the seller had granted the buyer a reasonable time in which to fulfil its contractual obligations).

24. [SERBIA Foreign Trade Court of Arbitration at the Serbian Chamber of Commerce 15 July 2008] ("For avoidance of the contract, a decision by a court or arbitral tribunal is not necessary"); CLOUT case No. 746 [AUSTRIA Oberlandesgericht Graz 29 July 2004] ("The CISG does not know any ipso facto avoidance of the contract").

25. See [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, April 2006 (Arbitral award No. CISG/2006/21)] (the contracts concluded in this case were not avoided since the seller did not inform the buyer of the avoidance); CLOUT case No. 746 [AUSTRIA Oberlandesgericht Graz 29 July 2004].

26. [GERMANY Oberlandesgericht Düsseldorf 22 July 2004] (the conduct of the seller invoking avoidance should have been such as to enable the buyer to conclude that the seller was terminating the contract); [SWITZERLAND Tribunal cantonal du Valais 2 December 2002] (avoidance of the contract "occurred by way of conclusive deeds"); CLOUT case No. 243 [FRANCE Cour d'appel de Grenoble 4 February 1999]; [GERMANY Landgericht Kassel 21 September 1995] ("The statement required to that effect under article 26 CISG can be made impliedly").

27. CLOUT case No. 427 [AUSTRIA Oberster Gerichtshof 28 April 2000] (It has to be clearly apparent from the declaration that the seller no longer wishes to be bound by the contract).

28. Cf. CLOUT case No. 746 [AUSTRIA Oberlandesgericht Graz 29 July 2004]; [AUSTRIA Oberlandesgericht Graz 24 January 2002]; CLOUT case No. 986 [CHINA International Economic and Trade Arbitration Commission, People's Republic of China, 4 February 2002]; CLOUT case No. 261 [SWITZERLAND Bezirksgericht der Saane 20 February 1997]. See, however, [ICC Arbitration Court of the International Chamber of Commerce, 2003 (Arbitral award No. 11849) (Fashion products case)], ruling that, when an additional period of time has been fixed, "termination needs a second, specific notification to be sent after the elapsing of such additional period of time."

29. Cf., for similar wording, [AUSTRIA Oberlandesgericht Graz 24 January 2002] (the seller had, on fixing an additional period of time, stated that "it would refuse to accept payment … and … would … claim damages for breach of contract"); CLOUT case No. 261 [SWITZERLAND Bezirksgericht der Saane 20 February 1997] (the seller had stated that it would refuse to accept performance and takeover of the goods by the buyer if the additional period of time lapsed without the buyer performing).

30. Cf. CLOUT case No. 746 [AUSTRIA Oberlandesgericht Graz 29 July 2004] (the notice fixing an additional period of time stated, "we will rely on claims for damages because of non-performance or avoid the contract"); CLOUT case No. 83 [GERMANY Oberlandesgericht München 2 March 1994] (a statement containing a reminder of the outstanding obliga tion to pay the price and referring to the possibility that the seller would withdraw from the contract).

31. See, by way of example, [FRANCE Tribunal de commerce de Versailles 12 March 2010]; CLOUT case No. 427 [AUSTRIA Oberster Gerichtshof 28 April 2000].

32. [GERMANY Landgericht Kassel 21 September 1995] (the seller instituted legal proceedings claiming compensation for the loss resulting from the "complete failure" of the transaction).

34. See CLOUT case No. 539 [AUSTRIA Oberlandesgericht Graz 31 May 2002].

35. See CLOUT case No. 826 [GERMANY Oberlandesgericht München 19 October 2006] (the court held that the right of avoidance had not been forfeited even though six months had elapsed between the fixing of the additional period of time by the seller and the declaration of avoidance, since the buyer could not expect that the seller would not utilize its rights).

36. See, as an illustration of the provision, [ICC Arbitration Court of the International Chamber of Commerce, 2003 (Arbitral award No. 11849) (Fashion products case)] (seller had sent a letter of termination after learning of the (late) opening of the letter of credit by the buyer).

37. See the Digest for article 49.


©Pace Law School Institute of International Commercial Law - Last updated July 30, 2012